Mid-Market Energy & Utilities Company (representative) · Energy & Utilities · United States · 16 weeks
Asset and reporting data carried through S/4HANA with zero blackout
A representative engagement. The risk that scared leadership was losing reporting, not the ERP conversion itself. We modernized BW and protected continuity through cutover.
Challenge
A roughly 2,800-person energy and utilities company on SAP ECC ran operations off a sprawling BW estate built over a decade, with hundreds of objects, many unused, and extractors that would break against S/4HANA. Asset and equipment master data was inconsistent across systems. If reporting went dark during the migration, operations and compliance reporting would both suffer.
Outcome
Reporting continued through the migration with no blackout. The estate was far smaller and easier to run, the numbers reconciled to the migrated data, and the company had a defined route to modern analytics rather than a like-for-like lift.
Results
- 16 wks Assessment, remediation, and BW modernization
- 2,100 to 680 BW objects, before and after rationalization
- Zero Reporting blackout days through the migration
- $1.3M Cost of a like-for-like BW lift avoided
Our biggest fear was going blind on operational reporting during cutover. It never happened. Thinklytics planned reporting continuity as part of the migration, retired years of clutter, and left us a foundation we can build on.
Related case studies
- We made finance and supply chain master data audit-ready for S/4HANA in 12 weeks, with the first close on time.
- We cut duplicate vendor and material data and unblocked a stalled S/4HANA migration in 9 weeks, with the go-live date held.
- We rescued a stalled S/4HANA migration and brought it to a clean go-live in 5 months, with zero downtime.