AT&T · Technology & SaaS · Dallas, TX · 16 weeks
AT&T Analytics & BI case study
AT&T faced serious server slowdowns with 6,000 Tableau workbooks built over seven years, causing executives to abandon dashboards before they fully loaded. Instead of spending $6.2 million on a platform migration, Thinklytics optimized the existing setup and restored performance.
Challenge
The Tableau Server had ballooned to 6,000 workbooks, with most unused for over 18 months. Dashboards took 47 seconds to load on average. The vendor recommended a complete BI platform migration, costing $6.2 million and taking 18 months.
Approach
We used Tableau’s REST API to gather data on workbook usage, last-accessed dates, and extract sizes. We found 4,380 workbooks with no views in the past year. After notifying stakeholders for 30 days, we retired those unused workbooks. Next, we rebuilt the 40 most-used executive dashboards with optimized extracts to improve performance.
Outcome
We cut dashboard load times from 47 seconds to 9 seconds. We retired 4,380 outdated workbooks, which made the planned $6.2M migration unnecessary. The remaining 1,620 workbooks now run efficiently on a server operating at just over a fifth of its capacity, improving overall system performance.
The one thing we overlooked in the migration plan, and how it caught us off guard
The vendor kept blaming the platform, but frankly, the real issue was seven years’ worth of workbooks stacking up on an untuned server. So, we started by digging into the usage data to get the full picture before making any changes.
We retired 4,380 unused workbooks without disrupting any active users.
We focused on the 30-day notification window. We sent every workbook owner an email with a direct link to their workbook and a clear deadline to ask for it to be saved. Out of 4,380 workbooks scheduled to retire, only 12 got saved because the owners reached out.
We tackled 40 workbooks head-on, fixing data glitches and speeding up reporting big time.
We tackled 40 key executive dashboards and gave them a solid tune-up. Cleaned up the data pulls and set up automatic refreshes. The payoff? Load times plummeted from 52 seconds to just 7. After that, the C-suite ditched their printed reports and jumped right into the dashboards.
Results
- 4,380 Workbooks retired
- 47s to 9s Dashboard load time
- $6.2M Platform migration avoided
- 22 of 100 servers retained Server capacity after cleanup
We were three weeks from closing a $6 million migration deal when Thinklytics showed us the usage data. That’s when we realized we were about to spend $6 million fixing a problem we had mostly created ourselves.
In the client's terms
The question
What decisions is this reporting supposed to support?
The situation
Tableau Server held 6,000 workbooks, most untouched for over 18 months, with dashboards averaging 47 seconds to load. The vendor recommendation was a full platform migration at $6.2M over 18 months.
What we found
The server was not slow because the platform was wrong. It was slow because it was carrying several thousand workbooks nobody had opened in a year. Migrating all of that to a new platform would have moved the problem at considerable expense.
What it produced
Load times fell from 47 seconds to 9. The 4,380 retired workbooks removed the case for the $6.2M migration. The remaining 1,620 run on a server at just over a fifth of capacity.
The roadmap
Usage, last-accessed dates and extract sizes came out of the Tableau REST API rather than from asking people what they used. That identified 4,380 workbooks with no views in twelve months. A 30-day stakeholder notice ran before anything was retired. The forty most-used executive dashboards were then rebuilt on optimised extracts.
The work behind this result
- Reporting takes too much work, the problem this engagement resolved.
- AI Reporting Automation for Tableau & Power BI
- Business Intelligence & Analytics Consulting
- Agentic BI Implementation Consulting
- Reporting Baseline and Benefits Worksheet, for whoever has to approve the spend.
- The 30 day Corporate Drag and Risk Diagnostic, findings yours either way.
Related case studies
- Migrated 140 Crystal Reports to Power BI in 20 weeks, cutting report time from 4 hours to 8 minutes and saving $1.1M per year in licensing costs.
- Consolidated 14 business unit data warehouses into a federated data mesh, cutting $4.7M in annual infrastructure costs and unlocking cross-unit analytics.
- We replaced nine outdated reporting systems with a single platform, reducing infrastructure costs by $3.1 million annually and cutting the monthly close process from 18 days to 3.
- We gave 340 clinical staff direct access to analytics, cutting ad-hoc report requests from 120 to 14 per week and saving $890K in analyst labor annually.